In 2016 Prestige Engineering Co.,Ltd commissioned a 2x10'000 m3 capacity water reservoir with innovative technology floating cover at Erdenet Mining Corporation. Thus increasing circulation water for technological use, storing water during the night time when the electricity costs are low therefore, saving 0.9 billion tugrug annually. Exploration, design drawing, construction work has been executed for the construction of the reservoir under a turnkey project contract. Under the framework of the project.
2x10'000 m3 capacity water reservoir, water inlet, outlet, drainage and spillway pipe and inlet and outlet manhole was installed and constructed .