Our company implemented a Water Supply project for the Boroo Gold ore processing factory including project design, procurement of equipment, pipelines and equipment installation and subsequent commissioning. This system consist of 5 deepwells of 28-50 l/s yield, 12.5 km water transmission pipeline, an intermediate water reservoir of 200 m3, a booster pump station having a head of 280 m and a flow of 430 m3/h and SCADA control system operating in full automatic mode.